4. Accelerated prosecution of European patent applications
4.3 Patent Prosecution Highway (PPH)
The Patent Prosecution Highway (PPH) enables an applicant whose claims have been determined to be allowable to have a corresponding application which has been filed with a PPH partner office processed in an accelerated manner while at the same time allowing the offices involved to exploit available work results. A request before the EPO must be filed before substantive examination has begun.
A PPH request can be based on:
(i)the latest PCT work product (WO‑ISA or IPRP/IPER) established by one of the PPH partner offices as ISA or IPEA (PPH based on PCT work products); or
(ii)any national work product (office action indicating allowable claims) established during the processing of a national application or of a PCT application that has entered the national phase before one of the PPH partner offices (PPH based on national work products).
Currently, the EPO's PPH partner offices are:
JPO (Japan) |
|
KIPO (South Korea) |
|
CNIPA (China) |
|
USPTO (USA) |
|
ILPO (Israel) |
|
CIPO (Canada) |
|
IMPI (Mexico) |
|
IPOS (Singapore) |
|
IPA (Australia) |
|
SIC (Colombia) |
|
MyIPO (Malaysia) |
|
IPOPHL (Philippines) |
|
INPI (Brazil) |
|
INDECOPI (Peru) |
|
SAIP (Saudi Arabia) |
|
INAPI (Chile) |
|
IPONZ (New Zealand) |
The PPH programmes with Rospatent (Russian Federation) and EAPO (Eurasia) have been suspended.